Detergent Powder Slurry Preparation System

Detergent Powder Slurry Preparation System

Details
Meibao’s slurry preparation system mixes powdered ingredients, liquid raw materials and process water in batches for detergent powder production. After aging, the slurry is transferred to the spray drying tower’s high-pressure feed system. For new plants and line upgrades, Meibao selects equipment to match the tower feed rate and connect to existing tanks, pumps and piping where needed.
Category
Spray Drying Detergent Powder Production Line
 
Send Inquiry
Description
Technical Parameters

Zhejiang Meibao Industrial Technology Co., Ltd. is one of the leading manufacturers and suppliers of detergent powder slurry preparation system in China. With abundant experience, we warmly welcome you to buy custom made detergent powder slurry preparation system from our factory. For price consultation, contact us.

 

Detergent Powder Slurry Preparation System

Batch slurry preparation for spray-dried detergent powder, from raw material dosing to the tower's high-pressure feed system.

Meibao's system prepares detergent slurry in batches for spray drying. Powdered ingredients, liquid raw materials and process water enter the mixing tank in the order specified by the formulation. After mixing and aging, the slurry flows to the tower's high-pressure feed system.

For a new plant, Meibao can supply equipment for raw material dosing, batch mixing, slurry aging and transfer. For an existing plant, Meibao reviews the tanks, pumps and piping you plan to retain, identifies the equipment to add or replace and specifies where it will connect to your line.

Stainless steel slurry preparation tanks, piping and operating platform in a detergent powder plant

Slurry preparation section with agitated mixing tanks and transfer piping.

New Plant

Raw material dosing, batch mixing, aging and slurry transfer supplied as one section.

Existing Line Upgrade

Tanks, pumps and piping you plan to keep are reviewed before new equipment is specified.

Clear Connection Points

The proposal identifies where raw materials enter and where slurry is handed over.

From Batch Mixing to Continuous Tower Feed

Five-step process flow diagram from raw material dosing to high-pressure tower feed

Process sequence of the detergent powder slurry preparation system.

Ingredients that require dissolving can be prepared as solutions before they enter the mixing tank. After mixing, the slurry moves to the aging tank. The formulation determines the temperature and holding time needed for hydration. Whether the tank needs insulation or heating depends on the incoming slurry temperature, the target aging temperature and site conditions.

Average output per tank = Net slurry discharged per batch / Full cycle time in hours

The cycle runs from the start of charging until the tank is ready for the next batch. The mixing tanks discharge in batches, while the spray drying tower requires a continuous supply of slurry. Meibao checks each tank's discharge schedule against the tower feed rate to determine how much slurry must be available between discharges. The working volume of the aging tank must also allow for the required holding time.

Equipment Selection and Scope of Supply

Start with target finished powder output, then calculate the slurry flow and pump duty required at the tower.

At the planning stage, you can start with your target output of finished detergent powder. Meibao accounts for the ingredients added after spray drying to calculate how much base powder the tower must produce. The target moisture content of the base powder and the solids content of the slurry then determine the required slurry mass flow rate (t/h).

To select a transfer pump, Meibao uses the slurry density at operating temperature to convert mass flow to volumetric flow (m³/h). Pump selection also takes into account slurry viscosity, the piping layout and the inlet requirements of the downstream equipment.

Process stage Available equipment Selection criteria
Raw material preparation and dosing Powder conveying and dosing equipment, liquid feed pumps and dissolving equipment for ingredients that require it. The form in which each ingredient arrives determines how it is metered and charged. For an existing tank farm, identify the connection point for each liquid feed.
Batch mixing and aging Agitated mixing tanks, aging tanks, temperature instruments and level instruments. Net batch size, discharge timing and required aging time determine the number of tanks and their working volumes. Meibao selects materials for wetted parts based on the properties of the slurry.
Slurry treatment Magnetic filters and slurry size-reduction equipment. A magnetic filter captures ferrous contaminants. Where fibrous material may enter the slurry, Meibao can assess whether a blade-type slurry cutter is suitable.
Slurry transfer and tower connection Slurry transfer pumps, piping, valves and controls. The high-pressure pump can be included in the agreed scope of supply. When connecting to an existing high-pressure pump, confirm its required inlet flow and pressure. Check the pump discharge pressure and spray nozzle operating pressure separately.
Slurry treatment and transfer equipment.

Slurry treatment and transfer equipment.

What the Quotation Defines

Equipment quantities, supply endpoints and responsibility for controls and site work.

Meibao lists the equipment and quantities in the quotation and identifies the connection points for incoming raw materials and outgoing slurry. The quotation states whether it includes dissolving equipment, a magnetic filter, a slurry cutter and a high-pressure pump. It also identifies who supplies the connecting piping, valves, instruments and control panels, and who is responsible for installation, commissioning and training.

Where the slurry system connects to an existing high-pressure pump or plant control system, the proposal specifies which start and stop commands, running status signals and fault signals the slurry system sends or receives. It also assigns responsibility for control software changes and on-site testing of the connected systems.

What to Send for a New Line or an Upgrade

The information required depends on whether you are building a new plant or upgrading an existing line.

Project type What to send with your initial inquiry Details to confirm during engineering
New production line Target finished powder output, operating hours per day, main raw materials and the process stages you want Meibao to supply. If you have already selected a spray drying tower or high-pressure pump, include the relevant data sheet. Slurry feed rate to the tower, solids content, operating temperature, density and viscosity. Include the temperature at which viscosity was measured. Also confirm the plant layout, available heat source and control requirements.
Existing line upgrade Current output, the problem you want to solve and the equipment you plan to retain. For example, the tower may run short of slurry between batches, or a transfer line may need frequent cleaning. A simple flow diagram or site photos can help identify the equipment involved. Batch records from charging through discharge, discharge times for successive batches, tank working volumes, actual pump operating conditions, piping connection points and the shutdown time available for the work.

Detergent Powder Production Line in Cuba

A 10 t/h finished powder line supplied with slurry preparation and tower feed equipment.

Meibao provided engineering, equipment manufacturing, installation, commissioning and training for a detergent powder line in Cuba. The line has a production capacity of 10 t/h of finished detergent powder.

The project included two agitated batch mixing tanks, one aging tank, slurry size-reduction equipment and a low-pressure slurry pump. A high-pressure pump feeds slurry to the spray drying tower.

Mixing and Aging

Two agitated batch mixing tanks and one aging tank prepared the slurry for the tower.

Slurry Treatment

Size-reduction equipment and a low-pressure slurry pump conditioned and transferred the slurry.

Tower Feed

A high-pressure pump delivered slurry to the spray drying tower.

Control room of the Cuba detergent powder production line with operators monitoring process screens

Central control room of the 10 t/h detergent powder line in Cuba.

Frequently Asked Questions

How is the output of one mixing tank calculated?
Divide the net amount of slurry discharged per batch by the full cycle time in hours. The cycle runs from the start of charging until the tank is ready for the next batch.
How is continuous feed to the tower maintained?
Meibao checks each tank's discharge schedule against the tower feed rate to determine how much slurry must be available between discharges. The aging tank's working volume also allows for the required holding time.
Can the system connect to an existing high-pressure pump?
Yes. Confirm the existing pump's required inlet flow and pressure, and check pump discharge pressure and spray nozzle operating pressure separately. The proposal also defines signal exchange and responsibility for software changes and on-site testing.
What should I send for an existing-line upgrade?
Send current output, the problem to solve, equipment you plan to retain and a simple flow diagram or site photos. Batch records, discharge times, tank working volumes and pump conditions are reviewed during engineering.

Discuss Your Slurry Preparation Project

Send your target finished powder output, operating hours, main raw materials and the process stages you want Meibao to supply. For an existing line, include the problem to solve and the equipment you plan to keep.

 

Hot Tags: detergent powder slurry preparation system, China detergent powder slurry preparation system manufacturers, suppliers, factory, Powder Soap Production Line, Washing Powder Making Processing Line, Laundry Powder Production Line, Laundry Detergent Production Line, Enviromental Tower Process Detergent Powder Production Plant, Turnkey Project Detergent Powder Production Line